FIDIC 1999 & 2017 notice clocks NEC3 & NEC4 compensation events Notice of Claim in 28 days Exceptional Event notices, Sub-Clause 18.2 Time impact analysis on Primavera P6 The Entitlement Ledger English & Arabic site records Data residency in the UAE & KSA Employer & Engineer edition

Win on the merits,
not the paperwork.

Lavinora reads every site diary, instruction, minute and programme update as it is written. It finds the events that entitle you to time and money, starts the contractual clock, and drafts the notice before the time bar closes.

For contractors and Engineers on FIDIC 1999, FIDIC 2017, NEC3 and NEC4 contracts in the GCC and India.

The problem

Most claims are lost before anyone argues them

01 —

The clock starts before anyone looks.

Under FIDIC you have 28 days from the day you became aware of an event — or should have. Miss it and the right never arises: in a 2023 Dubai case, 306 days of employer delay earned the contractor zero days of extension.[2]

02 —

The evidence sits in three systems.

The contract, the programme and the correspondence never talk. The diary line that matters waits for the month-end report.

03 —

Disputes start in administration.

For years, Arcadis’s global disputes reports ranked failure to properly administer the contract as the leading cause of construction disputes.[1]

How it works

From site diary to signed notice in a day.

01 / Compile the contract

Compile the contract

Upload the Agreement, Particular and General Conditions and Contract Data. Lavinora lists every notice duty with its trigger, deadline, form and recipient. Your contracts manager signs it off as the Day-1 Register.

02 / Watch the record

Watch the record

Connect Aconex or Procore, project email and the programme. Every diary, instruction, RFI and minute is read the day it lands, in English and Arabic.

03 / Start the clock

Start the clock, not a guess

Lavinora proposes the event, the clause and the awareness date, citing the earliest record. The deadlines are computed in code from your contract, never guessed by a model.

04 / Measure the impact

See the critical-path effect.

The event goes into the latest accepted programme as a fragnet. You see the projected delay to completion and the prolongation cost, with the logic visible — not a number from a black box.

05 / Sign, send, keep the record

A person signs. The ledger remembers.

An authorised person signs every notice and sends it the way your Contract Data requires. Receipt is logged, and the Entitlement Ledger becomes the record behind your final account.

Library

The notice clock, free.

No sign-up. Pick your contract and the kind of event, enter the day you became aware of it, and see every deadline it starts. Add them to your calendar in one click.

Calendar days, counted from awareness. Particular Conditions often change these periods, and some contracts define “day” differently. A planning aid, not legal advice.

Deadlines

Time bars at a glance

The periods most often missed on FIDIC and NEC projects, before any amendment by Particular Conditions.

ContractClauseWhat must happenDeadlineIf it is missed
FIDIC 201718.2Notice of an Exceptional Event14 days from awarenessExcused only from the date the notice is received
FIDIC 201720.2.1Notice of Claim for time or money28 days from awarenessThe other party is discharged, subject to 20.2.2 and 20.2.5
FIDIC 201720.2.2Engineer objects to a late Notice, with reasons14 days from receiving itThe Notice is deemed valid
FIDIC 201720.2.4Fully detailed Claim, with legal basis and records84 days from awareness, or as agreedThe Notice lapses if the legal basis is missing
FIDIC 199919.2Notice of Force Majeure14 days from awarenessRelief may be lost
FIDIC 199920.1Notice of claim28 days from awarenessTreated as a condition precedent by the English and DIFC courts
FIDIC 199920.1Fully detailed claim42 days from awareness, or as agreedDepends on drafting and governing law
NEC4 and NEC361.3Notify a compensation event8 weeks from awarenessNo change to Prices or Completion Date, unless the Project Manager should have notified it
UAE Civil Transactions LawArt. 816(3)Notify the employer of defects in its materials or factors hindering the workImmediatelyContractor liable for the consequences

Sources: [3] Fenwick Elliott on the 2017 claims procedure; [4] White & Case on FIDIC exceptional events; [5] Rimkus on NEC compensation events; [6] UAE Federal Decree-Law No. 25 of 2025.

Pricing

Priced per project, not per seat

Unlimited users on every plan. You pay for the contract we watch, banded by its value — on most packages above $100M, well under 0.1% of contract value a year.

Site
$1,500/month
Projects under $50M
  • Day-1 Register of notice duties
  • Event recognition on every record
  • The Clock, with escalation
  • Notice drafts with form checks
  • Unlimited users
Book a demo
Major
$9,000/month
Projects of $250M–$1B
  • Everything in Programme
  • Subcontractor pass-through
  • Multi-package ledger
  • Employer read access
  • Priority support
Book a demo
Mega
Custom
Over $1B · typically $180k–$300k a year
  • In-region or private deployment
  • SSO and full audit logs
  • Dedicated commercial analyst
  • Outcome benchmarks
  • Employer & Engineer edition
Talk to us

Entitlement Sweep

$15k–$25k fixed · credited against year one

We read six to twelve months of one live project’s records and hand back every event still inside its time bar — and every one already at risk. Most teams start here.

Request a sweep

Billed annually per project. Domestic Indian packages are priced in rupees.

About

We build the record that decides who gets paid

Construction contracts turn events into time and money, but only for the party that notices — in writing, in time. The evidence is almost always on file: a diary line, an instruction, a supplier’s email. Nobody reads all of it as it is written.

Lavinora does. We compile your contract once, read every record as it lands, and keep a living Entitlement Ledger: what happened, what it entitles you to, and the date that right expires.

We don’t replace your commercial team or your claims consultant. We make sure there is still a claim when they need one — and that the side with the better record is yours.

Founded
2026
Offices
Mumbai and Dubai
Markets
GCC and India first, then the UK and Australia
Contracts
FIDIC 1999 and 2017, NEC3 and NEC4

A named person signs every notice.

Software drafts. People decide. Nothing leaves your project without a signature.

The clock is code, not a guess.

Models read the record. Deadlines are computed deterministically from your contract.

Records stay in your region.

Gulf projects are hosted in the UAE or Saudi Arabia. Your data never trains a model unless you say so.

Both sides deserve the record.

Fewer surprises means fewer disputes. Contractors and Engineers work from the same facts.

Founder

A note from the founder

Why I’m building Lavinora

I grew up inside my family’s industrial electrical distribution business, one rung down the contractor supply chain. When I started working in it, most of my time went to documents — invoices, spreadsheets, contracts, correspondence. I learnt how much of a company’s money is decided by paper that nobody has time to read properly.

That ceiling is why I started building AI systems. Construction claims are the sharpest version of the problem I know: the facts are on file, the deadline is written in the contract, and a right worth millions can expire in 28 days because nobody connected the two. Lavinora connects them, on the day the record is written.

We are looking for our first design partners in the Gulf and India. If you run commercial on a FIDIC or NEC project and have ever lost a claim to a time bar, I’d like to hear how it happened.

Shriman Maheshwari, Founder & CEO

Book a demo

Bring one live project. We’ll show you its open clocks.

Thirty minutes with the founder. Tell us your contract form and the project you’re most worried about.

  1. We reply within one working day with two or three times that suit Dubai or India hours.
  2. A 30-minute call on your contract, your records and where notices go today.
  3. Optional: an Entitlement Sweep on that project, fixed fee, credited against year one.

This opens your email app with the request filled in, addressed to ceo@lavinora.cloud. Nothing is stored on this site.